CMS Timing Experiment
Spokes: Artur Apresyan
Relevant Notes:
Will use 120 GeV Beam, will be in the 6.1a hut
12/15/2017 update
This group includes several other groups. They are located both behind the telescope and in Section 6.1b. The 4 week block is broken up into two groups, with Si in charge of the first setup. Si’s group is sharing the time with a group from UVa. All groups are using the telescope or else no facility instruments. Matt Joyce is in charge of the UVa group.
3/28/2018 notes